Appearance
UN-GGCE Global Geodesy Supply Chain (GGSC)
Business Architecture Metamodel & Concept Taxonomy
Standard Alignment: BIZBOK® Guide (Business Architecture Guild) & W3C Holonic Architecture
Context: UN-GGCE Workstream 2 (Supply Chain Robustness) & Workstream 1 (International Governance)
Target Audience: Technical Product Working Groups (TPWGs), Geodetic Scientists, and Governance Authors
0. Business Architecture, Starting From Product
Business architecture describes an enterprise — here, the Global Geodesy Supply Chain — in terms stable enough to support decisions about risk, strategy and investment, independent of who currently does the work or what tools they use today. It starts from Product: the thing the global community actually receives (EOP, ITRF, ICRF, Satellite Orbits, Global Gravity Field). Everything else in this taxonomy exists to answer one question about that Product — is it robust, and if not, what closes the gap — so Product belongs at the centre of the model, not appended after the tools used to assess it.
Four elements do that assessing, each a different lens on the same Product:
(This is the classic BIZBOK wheel — Business Architecture Knowledge base domains arranged radially around the enterprise — drawn as an actual radial layout rather than a plain-text cross. Product sits at the centre; everything else is a spoke that exists to describe or deliver it.)
| Element | Answers | Role in this taxonomy |
|---|---|---|
| Product | What does the global community actually receive? | The thing being assessed — Primitive 1, the hub the other four orbit, not a fifth tool alongside them. |
| Capabilities | What can the supply chain do? | The unit of maturity scoring — generic, reusable across products (Primitive 3). |
| Value Stream Mapping (product workflows) | How do those capabilities compose, in sequence, to deliver a product? | What "Functions" were reaching for — the five geodetic product workflows (Primitive 2). |
| Information Flows | What is actually exchanged, and under what obligation? | Carries agreements and disclosure requirements as flow-level metadata, not a separate governance apparatus (Primitive 4). |
| Organisational Structure | Who or what physically performs a capability, and where? | Observing stations, data centres, analysis and combination centres, coordinating services (Primitive 5). |
Every question this engagement asks reduces to these four lenses on the Product, checked against each other: robustness is capability maturity tested against the value stream; risk is a disruption traced through organisational and information dependencies; investment priority is a gap in one of the four, correctly attributed to the right one rather than invented as a new category.
MECE governs how the capability set itself is evaluated and extended. Every proposed capability-model change — addition, split, merge, or definition deepening (outputs/capability_model_change_submission.md, Section A) — is ultimately a MECE test: collectively exhaustive (does a real function go uncovered — the test that found the Real-Time Monitoring and Stakeholder Disclosure gaps) and mutually exclusive (do two things in the model describe the same competency under different names — the test that found Functions largely redundant with Capabilities, and WP9's Components redundant with Organisations plus Capabilities). A change that isn't clearly one or the other isn't ready to submit — see the semantic-matching process in that document for how the test is actually run, function by function.
1. Purpose & Architectural Alignment
This taxonomy establishes a single, unambiguous conceptual model for the Global Geodesy Supply Chain (GGSC).
It resolves the cognitive friction in previous drafts by strictly aligning with BIZBOK® principles:
- Eliminating the ambiguous "Critical Functions" tier by integrating them directly as Level 2/3 Geodetic Capabilities, reconciled against the real, published State of Geodesy 2026 capability model (
data/shacl/ggsc-capability-maturity.databook.md) rather than inventing a parallel one — see Section 2's Status column. - Untangling "Product Components" by classifying them as Information Artifacts (data contracts passed between stages).
- Establishing a clean, 5-primitive metamodel that speaks the natural language of geodetic scientists while maintaining enterprise-grade architectural rigor.
2. The 5 Core Architectural Primitives
Primitive 1: Geodetic Product (The Value Proposition)
- Definition: A formal, standardized scientific or operational output delivered to global users, Member States, space agencies, and downstream industry.
- The 5 Core Products:
- Earth Orientation Parameters (EOP): Celestial/terrestrial pole coordinates, UT1-UTC, length-of-day.
- International Terrestrial Reference Frame (ITRF): Standardized 3D coordinate system and velocity field.
- International Celestial Reference Frame (ICRF): Astrometric coordinates of extragalactic radio sources (quasars).
- Satellite Orbits & Clocks: Precision ephemerides and clock states (GNSS, LEO, altimetry).
- Global Gravity Field Models: Static/temporal gravitational potential coefficients (geoid, mass transport).
Primitive 2: Value Stream / Workflow (The "How" Sequence)
- Definition: The end-to-end sequence of stages triggered by physical observation and culminating in product delivery.
- Standard Value Stream Stages:
- Stage 1 — Primary Observation Acquisition: Photons/signals received at sensors (VLBI, SLR, GNSS, DORIS).
- Stage 2 — Ingest & Pre-Processing: Data formatting, fringe-fitting, phase unwrapping, quality filtering.
- Stage 3 — Technique Analysis Center (AC) Reduction: Single-technique parameter estimation and normal equation formation.
- Stage 4 — Multi-Technique Combination: Inter-technique stacking, frame tie resolution, and constraint harmonization.
- Stage 5 — Product Synthesis & Quality Assurance: Quality validation, anomaly rejection, metadata tagging.
- Stage 6 — Dissemination & Archival: Public API, FAIR repository distribution, mirror replication.
Primitive 3: Capabilities (The "What" Abilities)
- Definition: The fundamental technical, scientific, and organizational abilities required to execute the value stream. Agnostic of who does it or what software is used.
- Structure:
Level 1: Capability Domain (the real, published 6 State of Geodesy 2026 domains)
└── Level 2: Capability (the real, scored 58 — not a new layer)
└── Level 3: Illustrative operation or, where marked PROPOSED,
a candidate sub-capability not yet in the modelReconciliation note: Level 3 below is illustrative detail under each existing Level 2 capability, not a new scored layer — it replaces "Critical Functions" as a plain-language way to talk through a workflow step without creating a competing taxonomy. Where no existing capability covers a real production step, that's marked PROPOSED and tracks the change process in outputs/capability_model_change_submission.md, not invented here. Domain names below are the real, published State of Geodesy 2026 domain names — not renamed for readability — so this table stays queryable against data/shacl/ggsc-capability-maturity.databook.md directly.
Taxonomy Breakdown:
| Level 1 Domain | Level 2 Capability | Status | Level 3 — Illustrative Operations |
|---|---|---|---|
| Asset and Infrastructure Management | Network Operations | Existing | VLBI Antenna Pointing & Tracking · SLR Laser Ranging & Epoch Timing · GNSS Multi-Constellation Reception · Space-Tie Vector Measurement |
| Asset and Infrastructure Management | Equipment Calibration and Maintenance | Existing | Frequency Standard (Maser) Synchronisation · Atmospheric Sensor Calibration |
| Asset and Infrastructure Management | Local Tie / Local Tie Processing and Analysis | Existing | Local Tie Metrology |
| Asset and Infrastructure Management | System Testing and Validation | Existing | Periodic system/instrument validation (not continuous — see Monitoring below) |
| Asset and Infrastructure Management | Real-Time Network/Observatory Monitoring | PROPOSED — submission B.2 | Real-Time Latency Monitoring · Anomaly & Outage Detection |
| Data Management | VLBI/GNSS/SLR/DORIS/Gravity Data Processing and Analysis | Existing (per technique) | VLBI Baseband Data Correlation · VLBI Fringe-Fitting & Delay Extraction · GNSS Carrier-Phase Disambiguation |
| Data Management | Data Sharing / Data Quality Management | Existing | FAIR Data Packaging & Verification (moved here from "Operational Performance Assurance" in the prior draft — this is a QA/sharing activity, not real-time monitoring) |
| Data Products and Software | Reference Frames / Geodetic Data Products | Existing | Satellite Orbit Integration & Propagation · Station Coordinate Inversion · EOP Tidal & Sub-Daily Modeling · Spherical Harmonic Gravity Solution |
| Data Products and Software | Combination Processing | OPEN QUESTION — submission B.1, corrected 16 Sep 2026 (was shown as PROPOSED like B.2, which overstated it — checked semantically, Geodetic Data Products/Reference Frames may already cover this, so B.1 is a genuinely unresolved question between deepening an existing definition and splitting a new capability, not a settled request) | Multi-Center Solution Stacking · Inter-Technique Geodetic Tie Reconciliation · Reference Frame Datum Alignment |
| Engagement and Collaboration | Stakeholder Identification and Analysis | Existing | — |
| Engagement and Collaboration | Stakeholder Communication and Engagement | Existing | — |
| Engagement and Collaboration | Stakeholder Disclosure and Public Reporting | PROPOSED — submission B.3 | Technical incident/performance report submission by contributing Member States and agencies to the relevant coordinating service |
| Engagement and Collaboration | Outreach and Public Awareness · Partnership and Collaboration · Standards Development and Promotion · Curriculum Development and Educational Program Delivery | Existing | Not elaborated to Level 3 here — not central to product workflow mapping |
| Governance and Strategy | Mandate · Legal Framework · Policy Formulation · Strategic Planning · Vision and Strategy · Budgeting · Cost Management · Funding and Investment · Regulatory Compliance · Performance Management | Existing | Scored per organisation/provider, not per product-function — see capability_model_change_submission.md Section C. Listed here for domain completeness, not elaborated to Level 3. |
| Innovation and Development | Research and Development Planning/Execution/Prototyping · Innovation Project Management · Innovation Strategy Development · Technology Assessment · Technology Scouting · Technology Integration · Knowledge Management | Existing | Not elaborated to Level 3 here — touched lightly per function (e.g. does this function rely on R&D-sourced tooling), not a primary workflow axis |
Primitive 4: Information Artifacts (The Data Contracts)
- Definition: The structured data payloads exchanged between nodes along the value stream. (Replaces the ambiguous term "Product Components").
| Lifecycle Stage | Information Artifact | Standard Formats / Syntax |
|---|---|---|
| Raw Acquisition | Raw Observational Data | Mark 6, VDIF, raw GNSS binary |
| Pre-Processed | Standardized Observation Logs | RINEX 3/4, CRD (SLR), vgosDB (VLBI) |
| Intermediate Analysis | Uncombined Solutions & Normal Equations | SINEX (Solution Independent Exchange) |
| Combination Output | Integrated Multi-Technique Solution | Combined SINEX, EOP Daily/Weekly Tables |
| Final Delivery | Published Ephemerides & Models | SP3 (Orbits), CLK (Clocks), ITRF Solution, ICGEM (Gravity) |
Terminology correction, 22 Sep 2026: the Raw Acquisition row previously read "Raw Observational Baseband." Corrected to the technique-neutral "Raw Observational Data" — "Baseband" is a real, precise term (the recorded raw voltage signal after down-conversion from RF to near-zero frequency, before correlation), but it is VLBI-specific vocabulary; GNSS, SLR, and DORIS raw data are never called "baseband" in their own communities. "Baseband" remains correct wherever a document is specifically describing the VLBI signal-recording step (e.g. Mark 6/VDIF recording, correlation) — it should not be used as the generic cross-technique artifact name.
Primitive 5: Organizations & Operational Roles
- Definition: The institutional entities that own, operate, or govern capabilities.
- Standardized Typology:
- Observing Stations / Networks: Physical sensor hosts (NASA, BKG, Geoscience Australia, Hartebeesthoek, etc.).
- Data Centers: Ingest and distribution hubs (CDDIS, BKG Data Center, EDC).
- Correlation Centers: Massive compute nodes for VLBI (Haystack, Bonn, Washington, Shanghai).
- Analysis Centers (ACs): Independent institutes computing uncombined solutions.
- Combination Centers (CCs): Lead institutes harmonizing AC outputs into single products.
- Coordinating Services & Governing Bodies: IAG Services (IGS, IVS, ILRS, IDS, IERS), GGOS, UN-GGCE.
3. The Robustness Evaluation Metamodel
Robustness is measured by evaluating how Capabilities (Primitive 3) perform across Value Streams (Primitive 2) under stress:
$$\text{Product Robustness} = f\Big(\text{Capability Maturity Floor} ;\cap; \text{Architectural Redundancy} ;\cap; \text{Disruption Resistance}\Big)$$
Not binary. A prior draft of this diagram showed [ROBUST] / [NOT YET] only. That drops a deliberate safeguard from the Robustness Testing Procedure (Section 13.3): missing evidence must never be presented as, or silently collapse into, a pass or a fail — it gets its own outcome, Not Yet Robust — Evidence Gap, so a gap in the record is never mistaken for a gap in the supply chain. Corrected here to match.
Deterministic Floor Rules:
- No Single Point of Failure (SPOF): If any critical Level 2 capability at a function relies on a single institution or software code base, with no demonstrated (not merely claimed) alternative, the product cannot be
ROBUST. - Minimum Maturity Floor ($M_{\text{req}}$): If an essential capability operates below its elicited threshold (e.g. Process at Level 1 "Ad-hoc" when Level 4 "Managed" is required — corrected 16 Sep 2026; the real level table at Annex A.2 has "Ad-hoc" at Level 1, not Level 2), the gap ($\Delta$) triggers
NOT YET ROBUST. - Disruption Survivability: If a simulated loss of a major jurisdiction halts product delivery for $> \text{Max Allowed Downtime}$, the product is
NOT YET ROBUST. - Missing evidence is not a pass. If any of the above cannot be evaluated because the underlying capture is incomplete, the product is
NOT YET ROBUST — EVIDENCE GAPon that point, not defaulted to the lowest-risk or highest-risk value either way.
4. Jargon Translation Matrix (For Document Authors)
| Old Document Jargon | Clean Metamodel Term | Reason for Change |
|---|---|---|
| Critical Function | Level 2 Capability, with Level 3 as illustrative detail | "Function" created an unnecessary third layer running in parallel to the real 58-capability model. Correlation, Stacking, and Orbit Fitting are detail under existing capabilities, not a competing taxonomy — the three gaps this reconciliation actually found (Combination Processing, Real-Time Monitoring, Stakeholder Disclosure and Public Reporting) are tracked as proposed additions, not assumed. |
| Product Component | Information Artifact | Separates the final Product from intermediate data contracts (SINEX, RINEX, raw observational data). |
| Workflow / Supply Chain | Value Stream | Aligns with standard enterprise value delivery syntax (Trigger $\rightarrow$ Value Realization). |
Correction, 16 Sep 2026: this table previously listed Instrument C1–C6 / A1–A10 as jargon to translate into "Data Capture / Assessment Canvas." That was wrong — C1–C6 (capture instruments) and A1–A10 (assessment instruments) are ROBUSTNESS_TESTING_PROCEDURE_v1.6's own real, current, authoritative instrument names (Sections 17–18), not bureaucratic acronyms invented elsewhere. outputs/project/eop_worked_example_v2.md uses them directly and by name throughout. Removed rather than relabelled — there is no cleaner term to translate them into, because they're already the clean term.
5. Guidance for TPWG Facilitation
This isn't a separate facilitation method — ROBUSTNESS_TESTING_PROCEDURE_v1.6 already has a fully specified one (Section 6): Track A (continuous, semi-structured system mapping — the C2 function record, C6 governance basis) for building shared understanding, and Track B (structured Delphi-style elicitation on C4 — Round 0 orientation, Round 1 anonymous written responses, synthesis, Round 2 facilitated workshop, TPWG Chair sign-off) for converging on defensible numbers. Continuity and recovery thresholds use the further bottom-up method at Section 6.3: establish the observed baseline, ask the narrower "how much worse than today would be unacceptable" question, stress-test against a disruption scenario, then ratify. outputs/project/eop_worked_example_v2.md shows this mechanism actually applied to EOP, work package by work package. This section is just the plain-language entry point into that real method, not an alternative to it.
When consulting geodesists and observatory directors:
- Do not ask: "What is the maturity of your governance instruments?"
- Do ask (these map onto C2's real field list — Section 9.1 of the Procedure):
- "What are the sequential steps in your workflow from photon capture to published table?" — populates C2's function list, F1...Fn.
- "What specialized capabilities (correlation, stacking, modeling) are needed at each step?" — feeds WP4's capability mapping (C3).
- "If your primary analysis center or correlation facility is knocked offline tomorrow, who takes over, and does the backup pipeline work automatically?" — the alternative, common-dependency and recovery-arrangement fields on C2, and the independence test WP6 later runs.
- "Is your function nominally shared across more than one country or institution — and if so, which specific piece of it would actually stop if just one of them withdrew?" — C2's own instruction to name the jurisdiction of the operationally critical sub-function separately, not the nominal one. This is the question that would have caught EOP's real USNO/SYRTE split from the start, instead of it surfacing later as a correction (see the worked example's WP3).