ROBUST GLOBAL GEODESY SUPPLY CHAIN
Worked Example — Earth Orientation Parameters (EOP), v3
Full WP1–WP10 Assessment Walkthrough | Simulated for Illustrative Purposes, Except Where Marked Real
Methodology: ROBUSTNESS_TESTING_PROCEDURE_v1.6.docx (9 September 2026) — Nick's current, authoritative procedure, not the earlier Work Plan v1.1/v1.2 this document was previously anchored on. Reconciled against the real State of Geodesy 2026 capability model throughout.
Relationship to the original, and to v2. v2 was a mechanical reauthoring of EOP_Worked_Example_GGSC.docx against the older Work Plan v1.1 — real capability names instead of invented C-XX IDs, Functions as framing rather than a parallel scored taxonomy, and the "Components" rollup replaced. v3 (this version) goes further, in two ways:
Re-anchored on v1.6, not v1.1. The Work Plan's "Template A/B/C/D" scheme is retired in v1.6 — a single form asking what something is, what it should be, and whether it passes cannot be completed by one person at one time (Annex B.1). It's replaced by six capture instruments (C1–C6, Section 17) and ten assessment instruments (A1–A10, Section 18), a formally designed two-track consultation method (Track A continuous mapping, Track B structured Delphi-style elicitation, Section 6), a bottom-up threshold-setting method (Section 6.3), and a corrected quantitative method (Annex A) —
Function Risk Score = Binding dimension gap × Criticality, gap measured as required minus current, not 5 minus current. This version uses all of it, by name, with real arithmetic shown rather than narrative assertion. The capability-model-change material from v2 (B.1 open question, B.2 New Capability Request,outputs/capability_model_change_submission.md) is unchanged and still correct — v1.6 doesn't touch that process.The F6 combination function is corrected, not simulated.
docs/EOP_Worked_Example_Comparison_BW.md(Ben's prior note) found that Nick's original single F6 — "IERS Earth Orientation Centre, France, SINGLE POINT OF FAILURE" — is actually two institutions in two jurisdictions per the real WA2 Annex: SYRTE (Observatoire de Paris, final products/Bulletin B, Medium real risk) and USNO (rapid products/Bulletin A, High real risk — the original modelled only the lower-risk half). This is exactly what C2's own field list produces when followed properly — "Jurisdiction: where nominally multi-jurisdictional, name the jurisdiction of the operationally critical sub-function separately" — so a document hardened against v1.6 that kept F6 undivided would be demonstrating C2 done wrong. This reverses v2's earlier "keep Nick's simulated numbers unchanged, minimise drift" decision, deliberately: that decision optimised for a simple mechanical reauthoring; this one optimises for showing the real methodology applied correctly, which means using the real split where one is known. All maturity/PPTD scores remain simulated for illustrative purposes; the F6a/F6b split and its institutional attribution are real.
About This Document
Purpose. This document walks through all work packages of the Robust GGSC process for the product Earth Orientation Parameters (EOP), hardened against ROBUSTNESS_TESTING_PROCEDURE_v1.6.docx so a reader can trace every number to the instrument and step that would actually produce it.
All PPTD scores, expert-elicitation numbers and modelled disruption results are simulated for illustrative purposes and do not represent real assessments. The F6a/F6b jurisdictional split (WP3, WP6, WP7) is a real correction, not a simulation — see the note above.
Structure. The document follows the ten work packages (WP1–WP10), naming the real capture instruments (C1–C6) and assessment instruments (A1–A10) each work package uses, per Sections 17–18 of the Procedure.
Two evidence conventions, kept separate (Section 5.4). Evidence status — established evidence / expert judgement / hypothesis to test / evidence gap — is recorded on captured facts (C-instruments). Confidence — High / Moderate / Low / Evidence required — is recorded on derived findings (A-instruments), and can never exceed the weakest evidence status it rests on (the ceiling rule). Earlier drafts of this document used a single "Confidence" column for both; this version keeps them distinct wherever the distinction matters.
Determination language. Three outcomes exist (Section 13.3): ROBUST, NOT YET ROBUST, or NOT YET ROBUST — EVIDENCE GAP where the blocking issue is missing evidence rather than a demonstrated failure. An evidence gap is never presented as, or silently collapsed into, a pass or a fail.
WP1 — Mobilisation and Evidence Preparation
Purpose (Section 7): confirm scope, evidence, product list, stakeholders and the consultation design before any assessment begins. WP1 assesses nothing — it builds the machinery every later work package depends on.
WP1 confirms the scope, evidence base, product communities and governance arrangements before analytical work begins. The outputs below would be agreed with UN-GGCE and the Technical Product Working Group (TPWG) for EOP before proceeding.
| WP1 Element | Status / Output |
|---|---|
| Product confirmed | Earth Orientation Parameters (EOP). |
| Methodology confirmed | ROBUSTNESS_TESTING_PROCEDURE_v1.6.docx. The real, published State of Geodesy capability set is the capability baseline — not a product-specific invented list. Robustness determined against six principles (P1–P6), never averaged (Section 3). |
| Capability-model change process confirmed | Where a function requires a capability the model doesn't have, the TPWG raises a formal New Capability Request rather than treating an informal name as if it were scored. Process, submission format and ratification path: outputs/capability_model_change_submission.md, Section A. |
| TPWG established | It should include IERS representatives, VLBI/GNSS/SLR/DORIS network operators, IGS/IVS/ILRS/IDS service leads, national agency representatives from ≥4 jurisdictions, and a named Chair through whom Track A first contacts run (Section 7.1). |
| Consultation design fixed | Track A (continuous system/evidence mapping) and Track B (structured Delphi-style elicitation: Round 0 orientation → Round 1 anonymous written elicitation on C4 → synthesis → Round 2 facilitated workshop → TPWG Chair sign-off) — Section 6. The scoring method (Annex A) and bottom-up threshold method (Section 6.3) are calibrated now, before the first number is elicited, so a later concurrent product's team isn't calibrating independently (Section 5.5). |
| Evidence register opened | Every captured statement carries an evidence status (established evidence / expert judgement / hypothesis to test / evidence gap) and a source. Derived findings carry a separate confidence (High / Moderate / Low / Evidence required), capped by the ceiling rule (Section 5.4). |
| Instruments established | Capture: C1–C6. Assessment: A1–A10 (Sections 17–18) — version-controlled forms, not yet populated. C6 (governance basis) opens immediately, logging what already governs EOP before WP2 starts. |
| Key control note | Current PPTD maturity ≠ robustness. Geographic distribution must be assessed independently of maturity (P1 excludes maturity scores as evidence). Political independence must be assessed independently of organisational diversity (P2). |
Instruments used (Section 7.2). C6 opened. C1–C5 and A1–A10 established as version-controlled forms.
Illustrative — EOP: WP1 confirms IERS as the natural home of the EOP TPWG, logs existing State of Geodesy findings on the IERS Earth Orientation Centre into the evidence register as established evidence, and records on C6 that daily EOP predictions currently rest on an informal IERS convention with no binding instrument behind it — flagged immediately as a governance gap to carry into WP2 and WP7, not discovered late.
WP2 — Product Requirements | Steps 1–2
Purpose (Section 8): turn "the product must be robust" into a measurable target. Instruments: capture C1 (product requirements), C4 (elicitation responses for thresholds), C6 (governance basis); assessment A1 (Product Requirements Specification).
Earth Orientation Parameters (EOP) describe the irregular rotation of the Earth and the relationship between the International Terrestrial Reference Frame (ITRF) and the International Celestial Reference Frame (ICRF). They are essential for satellite orbit determination, navigation, timing, VLBI scheduling and climate research.
C1 → A1 — EOP Product Requirements Specification
| Requirement Field | Specification | Evidence Status | Confidence |
|---|---|---|---|
| Applications / Users | GNSS orbit determination; spacecraft operations; VLBI scheduling; international timekeeping (UTC); geodetic reference frame maintenance; climate research (LOD for Earth rotation studies). | Established evidence | High |
| Accuracy — Polar Motion (x,y) | ≤ 0.05 mas (routine); ≤ 0.2 mas (rapid). Continuity across ITRF realisation required. | Established evidence | High |
| Accuracy — UT1–UTC | ≤ 0.02 ms (routine); ≤ 0.05 ms (rapid). Critical for timekeeping and navigation. | Established evidence | High |
| Accuracy — Nutation / Precession | Sub-mas level; must be consistent with ICRF and ITRF alignment standards. | Established evidence | High |
| Timeliness — Rapid products | Within 24 hours of observation epoch. Operational users (space agencies, navigation services) require near-real-time access. | Established evidence | High |
| Timeliness — Final products | Within 30 days. Used for science, ITRF maintenance and long-term records. | Established evidence | High |
| Availability | Continuous. No scheduled downtime acceptable for rapid products. Final products may tolerate brief delay if rapidly communicated. | Established evidence | High |
| Continuity | Long-term series continuity essential for climate and reference frame science. Series extends to 1962; future breaks must be bridged with documented overlap. | Established evidence | High |
| Acceptable degradation | Temporary use of lower-accuracy predictions acceptable for ≤ 48 hours for non-critical navigation. VLBI-dependent products cannot accept degradation beyond 24 hours. | Expert judgement | Moderate |
| Sustainability requirements | IERS mandate requires multi-decade horizon. Funding: mix of national and international contributions — structural vulnerability identified. Workforce: specialist geodesists and data analysts; succession risk in several institutions. | Expert judgement | Moderate |
Recovery and unacceptable-interruption thresholds — bottom-up method (Section 6.3)
Thresholds are not asserted; they are derived through the Procedure's own four-step method, worked through here for EOP's rapid-product recovery threshold:
| Step | Applied to EOP |
|---|---|
| 1. Establish the observed baseline | Outage-history review: EOP rapid products have never been late by more than three days in the last five years (simulated baseline, illustrative). Recorded as established evidence — descriptive, not a judgement. |
| 2. Ask the narrower question | Downstream navigation and space-agency users, asked via Track B Round 1 on C4 how much worse than three days would be genuinely unacceptable, converge on five days. |
| 3. Stress-test against a disruption scenario | Five days is tested against the WP6 loss-of-combination-centre scenario (DS-1, below): does the proposed threshold hold, or does it just restate current practice? |
| 4. Escalate for ratification | The EOP TPWG Chair confirms five days in writing on A1, forming the audit trail WP7 relies on. Every WP6 scenario is then tested against exactly this number, and WP7 Step 9 accepts or rejects on that comparison — not a separate, re-derived figure. |
| Requirement Field | Specification | Evidence Status | Confidence |
|---|---|---|---|
| Recovery requirement | Rapid products: recovery within 5 days (ratified via the bottom-up method above). Final products: within 60 days, TPWG validation still pending. | Rapid: expert judgement, TPWG-ratified. Final: hypothesis to test | Rapid: Moderate. Final: Low — TPWG validation required |
| Unacceptable interruption | Loss of UT1–UTC accuracy beyond 0.1 ms for > 72 hours constitutes an unacceptable interruption for timekeeping. Full product loss for > 5 days (per the ratified recovery threshold above) would compromise satellite operations globally. | Expert judgement, TPWG-ratified | Moderate |
WP3 — End-to-End Supply-Chain Mapping | Steps 3–4
Purpose (Section 9): turn the WP2 requirement into the literal chain of organisations, systems and infrastructure that produces it. Instruments: capture C2 (function record), C6 (governance basis). WP3 produces no assessment instrument — deliberately: v1.5 put a verdict form here and required mappers to record P1–P6 findings before the evidence existed (Annex B.1). WP3 only records what is.
Framing note. F1–F8 below organise the walkthrough and give the TPWG a checklist to confirm no production step is skipped. They are not themselves a scored unit — every function is mapped onto the real capabilities that support it in WP4. A function is a where/who/how, for this product instance; a capability is the generic, reusable competency behind it, scored once per function it supports. Keeping them separate is what lets WP4 ask "does a capability exist for this" without the answer being pre-decided by however the function happened to be named.
C2 asks Location and Jurisdiction as separate fields, and specifically instructs: "where nominally multi-jurisdictional, name the jurisdiction of the operationally critical sub-function separately." Applying that instruction properly to EOP's combination function is what splits F6 below — this isn't an arbitrary refinement, it's C2's own field list followed correctly. Per docs/EOP_Worked_Example_Comparison_BW.md: the real WA2 Annex shows EOP combination as two institutions — SYRTE (Observatoire de Paris, final products, Bulletin B) and USNO (rapid products, Bulletin A) — not one.
Information Artifact column added. C2's own field list also asks Input and Output per function — what a function requires, and what it produces. The taxonomy's Primitive 4 (Information Artifacts, outputs/project/ggsc_concept_taxonomy.md Section 2) defines the real EOP-relevant lifecycle: Raw Observational Baseband → Standardized Observation Logs (RINEX/vgosDB/CRD) → Uncombined Solutions (SINEX) → Integrated Multi-Technique Solution (Combined SINEX, Bulletin A/B) → Published Ephemerides (EOP C04). The column below traces exactly that lifecycle across F1–F8, closing a real gap in the previous version of this document: three of the four BIZBOK lenses (Value Stream, Capabilities, Organisations) were explicit, but Information Flow was only ever implicit in product names — never its own visible column.
| # | Function | Information Artifact Produced (Primitive 4) | Organisation | Location | Jurisdiction | Upstream Dependency | Alternative |
|---|---|---|---|---|---|---|---|
| F1 | Space geodetic observations (VLBI, GNSS, SLR, DORIS) | Raw Observational Baseband (Mark 6, VDIF, raw GNSS binary) | IVS network stations; IGS network; ILRS stations; DORIS network | Global | Multi-jurisdiction | Power, comms, maintained instruments | Partial — geographic distribution provides some resilience; gaps in southern hemisphere |
| F2 | Data transmission and collection | Raw Baseband, in transit — unchanged in kind, moved from station to data centre | IVS Data Centres (Bonn, Washington, Tsukuba); IGS Data Centres | Germany, USA, Japan | Germany, USA, Japan | F1 observations | Partial — geographic diversity limited; e-VLBI relies on high-bandwidth internet |
| F3 | Data archiving and replication | Standardized Observation Logs (RINEX 3/4, CRD, vgosDB) — first stage where the raw signal becomes a documented, interchange-format artifact | IERS Data Centres; IVS, IGS, ILRS archiving nodes | France, Germany, USA, Japan | France, Germany, USA, Japan | F2 transmission | Partial — some replication exists but not fully tested for all data types |
| F4 | Analysis — VLBI (UT1, nutation, polar motion) | Uncombined Solutions & Normal Equations (SINEX) — VLBI-specific | ~7 IVS analysis centres (Vienna, Bonn, Shanghai, Goddard, Onsala, etc.) | Austria, Germany, China, USA, Sweden | Austria, Germany, China, USA, Sweden | F3 archived data | Multiple analysis centres — partially redundant but geopolitically clustered |
| F5 | Analysis — GNSS (polar motion, LOD) | Uncombined Solutions & Normal Equations (SINEX) — GNSS-specific | IGS Analysis Centres (JPL, CODE, GFZ, ESOC, NGS, NRCan, etc.) | USA, Switzerland, Germany, France, Canada | USA, Switzerland, Germany, France, Canada | F3 archived data | Good diversity across centres; political concentration in Western group |
| F6a | Combination — Rapid products (Bulletin A) | Integrated Multi-Technique Solution — Bulletin A rapid-turnaround table | USNO (US Naval Observatory) | Washington DC, USA | USA | F4, F5 analysis outputs (SINEX) | No independent operational alternative for rapid products specifically — but F6b (final products, different jurisdiction) continues if F6a is lost |
| F6b | Combination — Final products (Bulletin B) | Integrated Multi-Technique Solution — Combined SINEX, Bulletin B | SYRTE, Observatoire de Paris | Paris, France | France | F4, F5 analysis outputs (SINEX) | No independent operational alternative for final products specifically — but F6a (rapid products, different jurisdiction) continues if F6b is lost |
| F7 | Product validation and quality control | Validated Bulletin A / Bulletin B — same artifact, quality-controlled, not yet a new one | IERS Central Bureau; TPWG oversight | Germany / France | Germany, France | F6a, F6b combined products | Limited — dependent on same institutions as combination |
| F8 | Product dissemination and user access | Published Ephemerides — final delivery stage: IERS EOP C04 (long-term series), Bulletin A/B (near-real-time) | IERS website, IERS FTP, downstream navigation / space agencies | France / Germany | France, Germany | F7 validated product | Some mirror services; not fully operationalised |
Critical finding (Step 4), corrected. The real assessment rates USNO (F6a) as the higher-risk institution, not SYRTE (F6b) — the reverse of the original worked example, which modelled only the lower-risk side and characterised it as the sole point of failure. Neither F6a nor F6b has an independent operational alternative for its own product track — each remains individually a single point of failure on the Annex A.3 criticality scale — but the two tracks sit in different jurisdictions, so a withdrawal event affecting one does not by itself terminate EOP production. This is the coordination-risk / concentration-risk distinction P2 tests explicitly (Annex A.7, see WP7) — not visible at all in the undivided F6.
Instruments used (Section 9.2). Capture: C2, C6. No assessment instrument in WP3.
Illustrative — EOP: an interview with IERS Earth Orientation Centre staff establishing F6a/F6b would record each combination track's provisional criticality separately (Annex A.3) from the alternative and common-dependency fields — never averaged into one "combination" rating — so WP5 elicitation starts from two concrete proposals, not one blurred function.
WP4 — Capability Mapping and Current Maturity | Steps 5–6
Purpose (Section 10): a factual, present-tense snapshot of current maturity — not yet a judgement about whether it's good enough (that's WP5). Instrument: capture C3 (capability and current maturity capture). WP4 produces no assessment instrument; the gap is computed in WP5 once the required level exists.
Twelve capability-at-function pairs from the real, published State of Geodesy capability set are applicable to EOP production (eleven distinct capabilities; Combination Processing now applies to both F6a and F6b following the WP3 split), mapped directly onto the functions F1–F8 above rather than to a separate ID scheme. Two functions — combination (F6a/F6b) and monitoring/assurance (touching F6a/F6b–F8) — have no lexical match in the real model. This is shown as it actually happens, including the part that doesn't resolve cleanly: the TPWG checks the real list against labels first, finds nothing, then does the semantic check Section A of capability_model_change_submission.md actually requires — comparing the function's plain-language description against candidate capabilities' full evidence summaries, not just their names. For monitoring/assurance, that check confirms the gap and produces a clean New Capability Request (B.2). For combination, it doesn't — Geodetic Data Products and Reference Frames both plausibly already cover it once read for meaning rather than for the word "combine," so B.1 is carried into WP5 and WP7 as an open question, not a settled request.
All PPTD scores are simulated on a 1–5 scale. What's real: the split itself, and the status column for both non-matching capabilities: B.2 carries forward provisionally (pending ratification, not as if already ratified); B.1 carries forward as unresolved (pending a TPWG decision between deepening an existing capability's definition and splitting out a new one).
C3 — Current Maturity Capture | Scores 1 (lowest) – 5 (highest), per Annex A.2 level definitions
| Function | Capability (real, or Requested) | Applicable? | P | Pr | T | D | Dimensionality | Evidence Status | Confidence |
|---|---|---|---|---|---|---|---|---|---|
| F1 | VLBI Data Acquisition and Storage | Required | 3 | 4 | 3 | 4 | 4/4 | Established evidence | Moderate |
| F1 | GNSS Data Acquisition and Storage | Required | 4 | 4 | 4 | 4 | 4/4 | Established evidence | High |
| F1 | SLR Data Acquisition and Storage | Required | 3 | 3 | 3 | 3 | 4/4 | Established evidence | Moderate |
| F1 | DORIS Data Acquisition and Storage | Required | 3 | 3 | 3 | 3 | 4/4 | Established evidence | Moderate |
| F2 | Network Operations | Required | 3 | 3 | 4 | 3 | 4/4 | Established evidence | Moderate |
| F3 | Data Preservation | Required | 3 | 4 | 3 | 3 | 4/4 | Established evidence | Moderate |
| F4 | VLBI Data Processing and Analysis | Required | 4 | 3 | 4 | 4 | 4/4 | Expert judgement | Moderate |
| F5 | GNSS Data Processing and Analysis | Required | 4 | 4 | 4 | 4 | 4/4 | Established evidence | High |
| F6a | Combination Processing — no label match in the real 58; open question, not a submitted request (B.1) | Open question | 3 | 4 | 3 | 4 | 4/4 | Expert judgement | Low — ceiling rule, and independently: unsettled which capability record this attaches to |
| F6b | Combination Processing — same open question (B.1), separate function instance | Open question | 3 | 3 | 3 | 4 | 4/4 | Expert judgement | Low — same basis as F6a |
| F7 | Data Quality Management | Required | 3 | 3 | 3 | 3 | 4/4 | Expert judgement | Low |
| F8 | Data Distribution | Required | 3 | 4 | 3 | 3 | 4/4 | Established evidence | Moderate |
| F1–F8 (workforce, all functions) | Training and Education | Required | 3 | 3 | 3 | N/A | 3/4 | Expert judgement | Low — see note below |
| F6a–F8 (monitoring, cross-cutting) | Real-Time Network/Observatory Monitoring — no match in the real 58; New Capability Request submitted (B.2) | Requested, not yet ratified | 2 | 2 | 3 | 2 | 4/4 | Hypothesis to test | Low — ceiling rule |
Note on workforce (Training and Education row): Training and Education is the closest existing capability, but a third New Capability Request — Workforce Succession and Continuity Planning (B.4) — has separately been drafted for the specific competency this row can't fully cover: continuity when a specific irreplaceable expert or undocumented toolchain is lost, as distinct from general skill development. B.4 held up under the same semantic check applied to B.1 below — its evidence comes from this engagement's own published ITRF annex, not from this EOP example, but the underlying single-point-of-failure pattern (a small, undocumented specialist team maintaining critical combination software) is the same one visible at F6a/F6b here. Not elaborated as a third full discovery narrative in this table to keep the walkthrough to the functions where it actually blocks a determination — but the same semantic-matching mechanism applies to it.
Step 6 note. Current maturity is never collapsed into a single figure (Section 10.1) — dimension-specific weakness stays visible, because that's exactly what an average would hide. No inferencing of geographic distribution from maturity scores is made (a control tested directly in WP7's P1 check). Dimensionality (number of applicable dimensions) is reported with every score per Annex A.2, so a two-dimension capability at full strength isn't structurally capped relative to a four-dimension one.
Instruments used (Section 10.2). Capture: C3.
Illustrative — EOP: for F6a (USNO, rapid), applicable capabilities include Combination Processing, Software Sustainment and Data Access and Sharing. Combination Processing scores People 3, Process 4, Technology 3, Data 4 — dimensionality 4/4. For F6b (SYRTE, final), the same capability scores 3/3/3/4 — a materially different Process rating, visible only because the two functions were kept separate rather than averaged into one "combination" figure.
WP5 — Required Maturity and Resilience Architecture | Steps 7–9
Purpose (Section 11): where current state meets required state, elicited via Track B Rounds 0–2 on C4 and scored per Annex A. Two separate outputs per function — how mature must this be, and what structure must exist around it — because a function can be highly mature and still structurally fragile. Instruments: capture C4, C6; assessment A2 (capability gap), A3 (resilience architecture determination).
The calculation (Annex A.4) — worked once, in full, before the table
Dimension gap (d) = max(0, Required(d) − Current(d)) — not 5 minus current. Measuring against the top of the scale would make the required level (the answer to Q2, and the output of an entire elicitation round) irrelevant to the arithmetic, and would inflate the apparent gap at capabilities already adequate for their function.
Binding dimension gap = the largest dimension gap across applicable dimensions — never a mean. Averaging People 4 with Technology 0 produces a comfortable number that describes nothing real; the binding gap surfaces the weakness that would actually cause the function to fail.
Function Risk Score = Binding dimension gap × Criticality (range 0–20, Annex A.3 for the criticality scale). A likelihood-times-consequence construction: only a function that is both materially short of its requirement and structurally irreplaceable scores high. It is a WP8 sequencing tool, not a robustness test — it has no geographic term, so it is never used to test P1 (Annex A.6 does that).
Worked for F6a (Combination, USNO, rapid products): required People 5 / Process 5 / Technology 4 / Data 5; current 3 / 4 / 3 / 4 (from WP4). Dimension gaps: 2, 1, 1, 1. Binding dimension gap = 2 (People). Criticality = 5 (F6a remains individually a single point of failure for rapid-product combination, even though F6b now covers final products independently — see below). Function Risk Score = 2 × 5 = 10.
A2 — Capability Gap Assessment
| Function | Capability | Current PPTD | Required PPTD | Dimension Gaps | Binding Gap | Criticality (A.3) | Function Risk Score | Classification (A.9) |
|---|---|---|---|---|---|---|---|---|
| F1 | VLBI Data Acquisition and Storage | 3/4/3/4 | 4/4/4/4 | 1,0,1,0 | 1 | 3 | 3 | Minor |
| F1 | GNSS Data Acquisition and Storage | 4/4/4/4 | 4/4/4/4 | 0,0,0,0 | 0 | 2 | 0 | Minor |
| F1 | SLR Data Acquisition and Storage | 3/3/3/3 | 4/4/4/4 | 1,1,1,1 | 1 | 3 | 3 | Minor |
| F1 | DORIS Data Acquisition and Storage | 3/3/3/3 | 4/4/4/4 | 1,1,1,1 | 1 | 3 | 3 | Minor |
| F2 | Network Operations | 3/3/4/3 | 4/4/4/4 | 1,1,0,1 | 1 | 3 | 3 | Minor |
| F3 | Data Preservation | 3/4/3/3 | 4/4/4/4 | 1,0,1,1 | 1 | 3 | 3 | Minor |
| F4 | VLBI Data Processing and Analysis | 4/3/4/4 | 4/4/4/4 | 0,1,0,0 | 1 | 2 | 2 | Minor |
| F5 | GNSS Data Processing and Analysis | 4/4/4/4 | 4/4/4/4 | 0,0,0,0 | 0 | 2 | 0 | Minor |
| F6a | Combination Processing (open question, B.1) | 3/4/3/4 | 5/5/4/5 | 2,1,1,1 | 2 | 5 | 10 | High |
| F6b | Combination Processing (same open question, B.1) | 3/3/3/4 | 5/5/4/5 | 2,2,1,1 | 2 | 5 | 10 | High |
| F7 | Data Quality Management | 3/3/3/3 | 4/4/4/4 | 1,1,1,1 | 1 | 4 | 4 | Minor |
| F8 | Data Distribution | 3/4/3/3 | 4/4/4/4 | 1,0,1,1 | 1 | 3 | 3 | Minor |
| F1–F8 (workforce) | Training and Education | 3/3/3/N/A | 4/4/3/N/A | 1,1,0 | 1 | 3 | 3 | Minor |
| F6a–F8 (monitoring) | Real-Time Network/Observatory Monitoring (requested, B.2) | 2/2/3/2 | 4/4/4/4 | 2,2,1,2 | 2 | 5 | 10 | High |
Classification bands per Annex A.9 (provisional, pending EOP-specific thresholds from Section 6.3): 16–20 Critical, 10–15 High, 5–9 Significant, 0–4 Minor. No function reaches Critical. Three reach High, for three structurally different reasons: F6a and F6b are each individually irreplaceable on their own product track (criticality 5) with a real maturity shortfall; Real-Time Monitoring is criticality 5 because it's cross-cutting to every critical function's assurance, not because any single station is irreplaceable. These are the three functions WP8 prioritises first — see below.
A note on what this table does not show. F6a and F6b individually carry the same Function Risk Score as the original undivided F6 did — splitting the function doesn't reduce either track's own maturity shortfall or criticality. What the split changes is the P2 finding in WP7, because P2 is tested by jurisdiction count (Annex A.7), a structural political-risk test that is completely independent of Function Risk Score. This is exactly the point Annex A.4 makes explicit: the Function Risk Score "contains no geographic term" and must never be used to infer P1 or P2 findings.
A3 — Resilience Architecture Determination | Steps 8–9
| Function | Required Resilience Strategy (Section 11.3) | Required Geographic Configuration | Required Political Independence | Independence Test Specified |
|---|---|---|---|---|
| F1 — Observations | Distributed by nature | ≥4 geographic regions; gaps in S. Hemisphere and polar zones must be addressed | ≥3 independent jurisdictions per technique | Coverage and geometry analysis; failure simulation of regional loss |
| F2 — Data transmission | Replicated + Redundant | Multiple transmission pathways; mirrored at ≥2 independent nodes | No single national internet dependency | Pathway loss simulation; backup activation test |
| F3 — Data archiving | Replicated | ≥3 independent archiving nodes in different jurisdictions | ≥3 separate jurisdictions | Restore test from independent node without primary access |
| F4 — VLBI analysis | Redundant | ≥3 active analysis centres in ≥3 jurisdictions | No single-jurisdiction monopoly | Independent replication of solution; blind comparison exercise |
| F5 — GNSS analysis | Redundant | Multiple existing centres — configuration largely adequate | Partially met — improvement in jurisdictional spread desirable | Independent replication exercise; already partially tested via IGS |
| F6a — Combination, rapid (USNO) | Unique but protected — no operational alternative exists for rapid-product combination specifically; duplication within the 5-day recovery threshold is judged impractical, so enhanced continuity protection is the required strategy, not a second rapid-product centre | Single site adequate for this track; the required distribution is across F6a/F6b's two jurisdictions, not within F6a itself | Independent of F6b (different jurisdiction) — met at the F6a/F6b pair level; not met at the F6a level alone | Documented succession, tested internal failover, independent backup power/comms — no cross-jurisdiction alternative is being built |
| F6b — Combination, final (SYRTE) | Unique but protected, same reasoning as F6a for the final-product track | Single site adequate for this track | Independent of F6a (different jurisdiction) — met at the pair level; not met at the F6b level alone | Documented succession, tested internal failover, independent backup power/comms |
| F7 — Validation | Independent of F6a/F6b provider | Separate institution from both combination centres | Independent jurisdiction from whichever function it validates | Validation must not depend on F6a/F6b provider staff or infrastructure |
| F8 — Dissemination | Replicated + Redundant | ≥2 independent distribution points | Not co-located with F6a or F6b | Failover demonstration; product available without primary IERS web infrastructure |
Why "Unique but protected" replaces "Redundant — PRIORITY" for F6a/F6b. The original undivided F6 required a second, fully independent combination centre (Redundant strategy) because it modelled one institution as the entire single point of failure. Once split, each track individually remains hard to duplicate within the ratified 5-day threshold — Section 11.3 requires querying whether duplication is genuinely practical before defaulting to Redundant, and for a function this specialised, it likely isn't within the roadmap horizon. The real required-configuration question moves from "does a second combination centre exist" to "are the two existing tracks genuinely independent of each other" — which Annex A.7's jurisdiction count, not the Function Risk Score, is what tests it (see WP7). Both are still blocked on resolving the open Combination Processing question (B.1) before their maturity gaps can be scored against a settled capability record.
Instruments used (Section 11.5). Capture: C4, C6. Assessment: A2, A3.
Illustrative — EOP: starting from People 3 / Process 4 / Technology 3 / Data 4 for F6a, Track B Rounds 1–2 determine required levels of 5/5/4/5 and ratify criticality 5. Binding dimension gap is 2 (People), giving a Function Risk Score of 10. Because no operationally practical alternative exists within the 5-day threshold and criticality is 5, the required strategy is Unique but protected: documented succession planning, tested internal failover and independent backup infrastructure at USNO itself — not a second rapid-product centre in a third jurisdiction, which Section 11.3 would only require if duplication were judged practical.
WP6 — Disruption Scenario Testing | Steps 10–11
Purpose (Section 12): the dynamic check — what actually happens when the WP5 architecture fails. Catches an arrangement that looks sound against the six principles but has never been stress-tested. Instruments: capture C5 (disruption scenario), C6 (authority to act); assessment A4 (disruption test result). Result vocabulary per Section 12.2: PASSES / PASSES WITH CONDITION / PARTIAL — EVIDENCE GAP / FAILS.
Six credible disruption scenarios across the Section 12.1 scenario classes, simulated for illustrative purposes except DS-1, which is split and re-run against the real F6a/F6b jurisdictional structure per docs/EOP_Worked_Example_Comparison_BW.md.
DS-1a — Organisation / Political: Withdrawal of USNO (F6a, rapid products)
| Field | Detail |
|---|---|
| Scenario class | Political (Section 12.1) |
| Scenario | Withdrawal of USNO — USA — from EOP rapid-product (Bulletin A) combination. |
| Failed components | F6a — Combination, rapid products; F7 (rapid-product validation only); F8 (rapid-product dissemination only). |
| Claimed mitigation | None operational for F6a specifically — the required strategy is Unique but protected (WP5), not Redundant, so no alternative rapid-product centre is claimed. |
| Independence test applied | N/A — no alternative is claimed for F6a itself. What is tested here is whether F6b (final products, France) is genuinely unaffected — the A3 independence test between F6a and F6b: independent software build, independent data access, independent staff, no shared infrastructure. |
| Common dependency | F6a and F6b are in different jurisdictions but both ultimately publish through IERS — checked and confirmed not a shared operational dependency (separate software, separate staff). |
| Product impact | Rapid EOP products (Bulletin A) unavailable. Final products (Bulletin B) continue via SYRTE/F6b, unaffected. Against the WP2 A1 threshold (5 days, ratified): rapid-product users lose near-real-time access but final, ratified-accuracy products keep publishing on schedule. |
| Recovery | No demonstrated recovery path for the rapid-product track specifically. Overall EOP product delivery does not stop. |
| Scenario result | PASSES WITH CONDITION — the product continues via F6b, but rapid-product users experience a real, undemonstrated-recovery degradation. Corrected from the original worked example's undivided "FAILS", which modelled only one combination institution and so could not see this outcome. |
| Mandatory consequence | Does not alone prevent a Robust determination — but the underlying F6a maturity gap (WP5, Function Risk Score 10) and the undemonstrated internal-failover independence test remain real, unresolved findings, carried to WP7 P5. |
| Residual gap | USNO succession planning and tested internal failover (I-4 revised, WP8). |
DS-1b — Organisation / Political: Withdrawal of SYRTE (F6b, final products)
| Field | Detail |
|---|---|
| Scenario class | Political |
| Scenario | Withdrawal of SYRTE / Observatoire de Paris — France — from EOP final-product (Bulletin B) combination. |
| Failed components | F6b — Combination, final products; F7 (final-product validation only); F8 (final-product dissemination only). |
| Claimed mitigation | None operational for F6b specifically — Unique but protected, same basis as F6a. |
| Independence test applied | Same A3 pair-independence test as DS-1a, run in the other direction: is F6a genuinely unaffected by an SYRTE-side event. |
| Common dependency | As DS-1a — confirmed not shared. |
| Product impact | Final EOP products (Bulletin B) unavailable. Rapid products (Bulletin A) continue via USNO/F6a, unaffected. |
| Recovery | No demonstrated recovery path for the final-product track specifically. Overall EOP product delivery does not stop. |
| Scenario result | PASSES WITH CONDITION — same reasoning as DS-1a, mirrored. |
| Mandatory consequence | Does not alone prevent a Robust determination; F6b's own maturity gap and failover-independence evidence gap are carried to WP7 P5. |
| Residual gap | SYRTE succession planning and tested internal failover (I-4 revised, WP8). |
What changed, and why it matters more than the input correction alone. This is not just a corrected input — it's evidence the disruption-testing mechanism works as intended once given accurate structure (per the Comparison note). The original single-F6 model produced a "total failure" result because it couldn't represent two independent tracks. The corrected model reproduces the nuanced "partial continuity" finding P2's jurisdiction-count test (Annex A.7) is specifically designed to surface — coordination risk between two jurisdictions, not concentration risk in one. Whether F6a and F6b are robust is still a separate question, answered in WP7: each individually carries a real maturity gap and an undemonstrated internal-failover claim.
DS-2 — Technical / Infrastructure: Simultaneous outage of the two primary IVS VLBI data centres
| Field | Detail |
|---|---|
| Scenario | Simultaneous outage of the two primary IVS VLBI data centres (Bonn and Washington). |
| Failed components | F2 — data transmission; F3 — archiving; F4 — VLBI analysis (blocked by data unavailability). |
| Alternative / mitigation | Tsukuba (Japan) data centre holds partial archives. e-VLBI transmission can be rerouted but has not been operationally tested under full-load conditions. |
| Common dependency | All three centres use a common e-VLBI backbone infrastructure from the same provider. |
| Product impact | VLBI-based UT1 determination halted. Rapid EOP products degrade to GNSS-only solutions — polar motion maintained at reduced accuracy; UT1 accuracy drops significantly. |
| Recovery | Partial recovery via Tsukuba within ~5 days for archived data. Real-time e-VLBI: untested alternative pathway — evidence gap. |
| Scenario result | PARTIAL — EVIDENCE GAP |
| Mandatory consequence | Evidence gap on the real-time e-VLBI failover claim prevents a Robust finding on this point — never counted as available until demonstrated. |
| Residual gap | Third independent data transmission pathway required; Tsukuba restore test needed; e-VLBI failover exercise required. |
DS-3 — Political: Loss of GNSS analysis centre contributions from one major jurisdiction
| Field | Detail |
|---|---|
| Scenario | Loss of GNSS analysis centre contributions from one major jurisdiction (e.g. US centres withdraw from IGS combination). |
| Failed components | F5 — GNSS analysis: JPL and NGS contributions absent. |
| Alternative / mitigation | CODE (Switzerland), GFZ (Germany), ESOC (France/Germany), NRCan (Canada), Wuhan (China) — five alternative centres continue. |
| Common dependency | Common satellite orbit models and reference frame constraints could introduce systematic effects across all centres. |
| Product impact | Polar motion and LOD accuracy reduced but within acceptable bounds if ≥3 remaining centres continue. No unacceptable interruption provided combination proceeds. |
| Recovery | Automatic — IGS combination re-weighted. Product continues within degraded-but-acceptable bounds. |
| Scenario result | PASSES WITH CONDITION |
| Mandatory consequence | Does not prevent a Robust determination; the condition (pre-quantifying systematic effects) is carried as a residual vulnerability. |
| Residual gap | Systematic effects of withdrawal should be pre-quantified. Formal IGS protocol for centre withdrawal needed. |
DS-4 — Environmental / Infrastructure: Major earthquake or natural disaster disabling ≥30% of VLBI stations
| Field | Detail |
|---|---|
| Scenario | Major earthquake or natural disaster disabling ≥30% of VLBI stations in one geographic region (e.g. Central Europe). |
| Failed components | F1 — Observations: European VLBI stations (Wettzell, Onsala, Noto, Yebes, Medicina, Effelsberg). |
| Alternative / mitigation | Remaining IVS network: East Asian, North American, Australian, African stations continue. Southern hemisphere coverage already sparse. |
| Common dependency | European concentrations mean geometry of global VLBI solution degrades significantly. |
| Product impact | VLBI solution quality degrades — formal errors on nutation parameters increase by ~40% (simulated). UT1 accuracy reduces. Polar motion GNSS-maintained at normal accuracy. Overall EOP product remains within acceptable bounds for 30-day window. |
| Recovery | Passes within 30-day recovery window. Beyond 30 days, sustained outage would breach requirements. |
| Scenario result | PASSES WITH CONDITION |
| Mandatory consequence | Does not prevent a Robust determination in the short term; the condition (30-day ceiling) is carried as a residual vulnerability, not resolved. |
| Residual gap | Southern hemisphere VLBI station gap is a systemic vulnerability. Station resilience investment needed in underrepresented regions. |
DS-5 — Financial: Loss of core IERS funding from two major national contributors
| Field | Detail |
|---|---|
| Scenario | Loss of core national funding from the USA and France simultaneously — the two contributors now identifiable as material once combination is correctly mapped to F6a (USNO) and F6b (SYRTE). |
| Failed components | F6a and F6b — combination, both tracks simultaneously; F7 — validation; F4 — some analysis centre contributions at risk. |
| Alternative / mitigation | No emergency funding mechanism exists at either institution. Reserve funds estimated at < 6 months operating costs. |
| Common dependency | Both tracks depend on their own national funding stream, but neither has a diversified or multilateral alternative — a shared structural weakness even though the funding sources themselves are distinct. |
| Product impact | Both combination tracks' operational capacity reduces within 3 months. Product quality and timeliness degrades on both rapid and final products simultaneously — this scenario is the one credible event that affects F6a and F6b together, unlike DS-1a/DS-1b. |
| Recovery | No demonstrated recovery. Dependent on intergovernmental negotiation — timeline unpredictable. |
| Scenario result | FAILS |
| Mandatory consequence | Mandatory fail — no emergency funding mechanism exists; prevents a Robust determination on its own regardless of other findings. |
| Residual gap | Sustainable multi-source funding mechanism required (P3, P4 sustainability). Emergency reserve funding needed. |
DS-6 — Technical — Cyber: Cyber incident corrupting or making inaccessible the IERS Central Bureau
| Field | Detail |
|---|---|
| Scenario | Cyber incident corrupting or making inaccessible the IERS Central Bureau data holdings and software environment. |
| Failed components | F6a, F6b — the IERS Central Bureau coordinates both tracks, so a Central-Bureau-level incident is one of the few credible events that could touch both jurisdictions' working datasets at once, unlike DS-1a/DS-1b; F7 — validation; F8 — dissemination. |
| Alternative / mitigation | Offline backups reportedly maintained — but restore procedure has not been tested operationally. Software documentation is partial. |
| Common dependency | Backups stored in same physical facility — not geographically independent. |
| Product impact | If restoration from backup succeeds within 48 hours: rapid products delayed but recoverable. If restore fails or takes > 72 hours: products lapse beyond acceptable threshold. |
| Recovery | Evidence gap — restoration from independent backup not demonstrated. Cannot be counted as available per quality-control rules. |
| Scenario result | PARTIAL — EVIDENCE GAP |
| Mandatory consequence | An evidence gap is never evidence of robustness (Section 13.3) — this alone is sufficient grounds for NOT YET ROBUST — EVIDENCE GAP on this point until the restore is demonstrated. |
| Residual gap | Geographically separate backup required; documented and tested restore procedure required; software documentation gap must be closed. |
Disruption Test Summary
| Scenario | Class (Section 12.1) | Result | Consequence for Determination |
|---|---|---|---|
| DS-1a | Political | PASSES WITH CONDITION | No mandatory fail — corrected from the original undivided F6's FAILS; F6a's own maturity gap and undemonstrated failover independence still carried to WP7 |
| DS-1b | Political | PASSES WITH CONDITION | No mandatory fail — mirrors DS-1a; F6b's own gaps still carried to WP7 |
| DS-2 | Technical/Infrastructure | PARTIAL — EVIDENCE GAP | Evidence gap — cannot be counted as Robust on this point |
| DS-3 | Political | PASSES WITH CONDITION | No mandatory fail; systematic effects to be pre-quantified |
| DS-4 | Environmental | PASSES WITH CONDITION | Passes short-term; sustained outage would breach requirements |
| DS-5 | Financial | FAILS | Mandatory fail — no emergency funding mechanism |
| DS-6 | Technical — Cyber | PARTIAL — EVIDENCE GAP | Evidence gap — cannot be counted as Robust on this point |
Instruments used (Section 12.4). Capture: C5, C6. Assessment: A4.
Illustrative — EOP: "loss of USNO for ten days" is traced through the WP3 map — F4/F5 analysis still arrives, but nothing combines it into Bulletin A, so rapid products lapse. The claimed continuity of final products via SYRTE is then tested against the A3 independence test between F6a and F6b: separate software build, separate data access, separate staff. Because no live cross-institution failover exercise has ever been run to confirm the two tracks share nothing operationally, the result is recorded as modelled with Low confidence — not presented as a demonstrated pass.
WP7 — Robustness Determination | Step 12
Purpose (Section 13): generates no new evidence. Applies a fixed eleven-step process (Section 13.2) to everything WP2–WP6 produced and records one auditable determination. Principles are tested separately and never averaged. Instruments: assessment A5 (principle test sheet), A6 (robustness decision record), A8 (governance requirement record). No capture instrument — if WP7 needs a fact that doesn't exist, it returns to the relevant capture instrument and records an evidence gap.
A5 — Principle Test Sheet (P1–P6)
| Principle | Method Applied | Evidence Used | Finding | Reasoning / Excluded Evidence |
|---|---|---|---|---|
| P1 — Geographic Distribution | Geographic test, 4 checks (Annex A.6): coverage, concentration, separation, sustainment — MET only if all four pass. | Coverage: VLBI adequate in Northern hemisphere, gaps in Southern hemisphere/Africa (fails check 1). Concentration: combination capacity now split USA/France rather than 100% Paris (improves check 2 versus the original undivided F6). Separation: both jurisdictions are Western-aligned, sharing some correlated political/economic exposure though not physical infrastructure (partial pass, check 3). Sustainment: archiving has 3 funded nodes but with some political clustering (check 4, partial). | PARTIALLY MET | Excluded: WP4 maturity scores — P1 is never inferred from maturity (Annex A.6). Reasoning: check 1 alone (Southern-hemisphere coverage gap) is sufficient to prevent a full MET, independent of the combination-concentration improvement. |
| P2 — Political Resilience | Jurisdiction count (Annex A.7) — coordination risk and concentration risk tested and reported separately, not combined. | F6a (USNO, USA) and F6b (SYRTE, France): two jurisdictions, no unified mandate binding them together (coordination risk — confirmed present). Neither track individually has a backup in a third jurisdiction (concentration risk within each track — also present, but no longer a single-jurisdiction total dependency for the product as a whole). Tested against DS-1a/DS-1b: PASSES WITH CONDITION, not FAILS. | PARTIALLY MET — improved from the original undivided F6's NOT MET | Excluded: organisational diversity within one jurisdiction is not accepted as evidence of jurisdictional independence (unchanged control). Reasoning: this finding genuinely improves once F6 is correctly split — but see the note below the table: it does not, on its own, change the product-level determination. |
| P3 — Centralised Accountability through Multilateral Governance | Floor check (Annex A.8) against the Governance and Strategy domain: named accountable body, authority, funding, escalation. | IERS has clear mandate; Central Bureau provides coordination. Governance and Strategy domain capabilities scored per organisation, not per function (capability_model_change_submission.md Section C). Funding escalation mechanisms weak; no emergency governance protocol documented (confirmed by DS-5). | PARTIALLY MET | Mandate clear; funding resilience and escalation protocols insufficient. Governance requirement arising, recorded per C6: a binding emergency-funding escalation instrument does not currently exist. |
| P4 — Technical Interoperability and Data Accessibility | Floor check (Annex A.8) against Data Management and Data Products and Software domains, plus WP6 evidence that a qualified alternative can actually assume the function. | IERS standards well documented; data formats (IERS EOP C04) open. Combination software partially documented; restore not tested (DS-6, PARTIAL — EVIDENCE GAP). Cross-institution failover between F6a and F6b not demonstrated (DS-1a/DS-1b, modelled not exercised). | PARTIALLY MET | Data standards good; software documentation and tested failover absent on both tracks. An untested claim is not counted as available regardless of how sound the underlying standards are. |
| P5 — Minimum Capability Maturity | Floor check (Annex A.8), catch-all across every capability linked to every critical function, dimension by dimension — never a domain average. | From A2 (WP5): F6a Function Risk Score 10 (binding gap 2, People), F6b Function Risk Score 10 (binding gap 2), Real-Time Monitoring Function Risk Score 10 (binding gap 2) — all three in the High band (Annex A.9). VLBI/SLR/DORIS acquisition: 1-point gaps, Minor band. | NOT MET | Three functions carry a real, High-band maturity shortfall, and two of the three sit on capability records that aren't fully settled: F6a/F6b's Combination Processing is an open question (B.1, not yet resolved which real capability it attaches to); Real-Time Monitoring is a New Capability Request (B.2, not yet ratified). Splitting F6 did not close either gap — it clarified which jurisdiction each gap belongs to. |
| P6 — Transparency, Monitoring and Performance Assurance | Floor check (Annex A.8) against monitoring/assurance capabilities plus the Engagement and Collaboration domain. | Real-Time Network/Observatory Monitoring: 2/2/3/2 against required 4/4/4/4, Function Risk Score 10. IERS annual report provides some transparency; incident management not formally documented; risk register not publicly evidenced. | NOT MET | The largest single capability gap identified in the assessment, corroborated by the absence of any incident-management step surviving contact with the WP6 disruption tests (DS-2, DS-6 both evidence gaps on exactly this point). |
What the corrected split changes, and what it doesn't. P2 moves from a clean NOT MET to PARTIALLY MET — a real, substantive improvement directly caused by mapping F6 accurately instead of as one institution. But per Section 3's own rule, principles are never averaged: a strong or improved result on P2 cannot compensate for P5 and P6 remaining NOT MET, or for DS-5's mandatory fail. The product-level determination does not change. This is deliberately shown rather than smoothed over — a worked example that let one corrected input flip the whole determination would misrepresent how the decision rules are meant to work.
Disruption Test Summary
| Scenario | Class (Section 12.1) | Result | Consequence for Determination |
|---|---|---|---|
| DS-1a | Political | PASSES WITH CONDITION | No mandatory fail — corrected from the original undivided F6's FAILS; F6a's own maturity gap and undemonstrated failover independence still carried to WP7 |
| DS-1b | Political | PASSES WITH CONDITION | No mandatory fail — mirrors DS-1a; F6b's own gaps still carried to WP7 |
| DS-2 | Technical/Infrastructure | PARTIAL — EVIDENCE GAP | Evidence gap — cannot be counted as Robust on this point |
| DS-3 | Political | PASSES WITH CONDITION | No mandatory fail; systematic effects to be pre-quantified |
| DS-4 | Environmental | PASSES WITH CONDITION | Passes short-term; sustained outage would breach requirements |
| DS-5 | Financial | FAILS | Mandatory fail — no emergency funding mechanism |
| DS-6 | Technical — Cyber | PARTIAL — EVIDENCE GAP | Evidence gap — cannot be counted as Robust on this point |
Instruments used (Section 12.4). Capture: C5, C6. Assessment: A4.
Illustrative — EOP: "loss of USNO for ten days" is traced through the WP3 map — F4/F5 analysis still arrives, but nothing combines it into Bulletin A, so rapid products lapse. The claimed continuity of final products via SYRTE is then tested against the A3 independence test between F6a and F6b: separate software build, separate data access, separate staff. Because no live cross-institution failover exercise has ever been run to confirm the two tracks share nothing operationally, the result is recorded as modelled with Low confidence — not presented as a demonstrated pass.
PRODUCT DETERMINATION: EARTH ORIENTATION PARAMETERS
NOT YET ROBUST
Validated by: EOP Technical Product Working Group / UN-GGCE
Same overall determination as the original worked example, reached differently and more accurately. The P2 finding genuinely improves once F6 is correctly split into F6a/F6b (concentration risk in one jurisdiction becomes coordination risk across two) — a real, evidence-driven change, not a rounding difference. It does not change the product-level outcome: P5 and P6 remain independently unmet, and DS-5 remains a mandatory fail on its own. Per Section 3, principles are never averaged, so an improvement on one can't buy back a failure on another. The P5 finding also carries the same structural point as v2: both critical gaps (F6a/F6b's Combination Processing, and Real-Time Monitoring) sit on capability records with an additional, independent problem beyond the maturity numbers — one pending ratification, one an open question about which existing capability it belongs to.
A6 — Robustness Decision Record
| Decision Record Field | Content |
|---|---|
| Product | Earth Orientation Parameters (EOP) |
| Overall status | NOT YET ROBUST |
| Mandatory requirements | All agreed requirements defined (WP2, A1). Rapid-product recovery threshold ratified at 5 days via the bottom-up method (Section 6.3); final-product threshold still pending formal TPWG confirmation — recorded as an evidence gap. |
| Critical functions | F6a (Combination, rapid, USNO) and F6b (Combination, final, SYRTE) are each individually a single point of failure on their own product track (criticality 5), in separate jurisdictions. F7 (Validation) depends on the relevant F6a/F6b provider. F8 (Dissemination) partially replicated but not operationally tested. |
| P1 finding | Partially met. Southern hemisphere VLBI gap is the binding failure on the geographic test (Annex A.6); combination concentration improved (two jurisdictions, not one) but does not by itself change the P1 finding. |
| P2 finding | Partially met — improved from Not Met. F6a (USA) and F6b (France): coordination risk confirmed (no unified mandate across the two), concentration risk reduced (no longer one jurisdiction for the whole product). Tested against DS-1a/DS-1b: PASSES WITH CONDITION, not FAILS. Jurisdiction count method: Annex A.7. |
| P3 finding | Partially met. Mandate and accountability clear. Funding escalation and emergency governance insufficient (Governance and Strategy domain floor check, Annex A.8). |
| P4 finding | Partially met. Data standards good. Software documentation and cross-institution (F6a/F6b) failover testing absent. |
| P5 finding | Not met. F6a and F6b: Function Risk Score 10 each (binding dimension gap 2 × criticality 5), High band (Annex A.9) — and the capability itself is an open question (B.1 — deepen Geodetic Data Products/Reference Frames, or split). Real-Time Network/Observatory Monitoring: Function Risk Score 10, High band, and pending ratification (New Capability Request B.2). |
| P6 finding | Not met. Monitoring, incident management and corrective action framework substantially absent (Engagement and Collaboration domain floor check). |
| Disruption failures | DS-5 (funding) is a mandatory fail. DS-1a, DS-1b (combination withdrawal, either jurisdiction) are PASSES WITH CONDITION — no longer mandatory fails once correctly split. DS-2 and DS-6 are evidence gaps. |
| Evidence gaps | DS-2 e-VLBI failover; DS-6 backup restore; F6a/F6b cross-institution independence never live-exercised; final-product recovery threshold (TPWG pending); ratification status of B.2; resolution of the open B.1 question. |
| Residual vulnerabilities | Southern hemisphere station gap; funding sustainability; IERS software documentation; workforce succession at both USNO and SYRTE (see also New Capability Request B.4); the F6a/F6b independence claim itself is asserted, not demonstrated. |
| Decision rationale | P5 and P6 are unmet, and DS-5 is a mandatory fail — any one of these is independently sufficient for NOT YET ROBUST, regardless of P2's genuine improvement. Evidence gaps (DS-2, DS-6, the untested F6a/F6b independence claim) further prevent a Robust classification on their own points. Strong performance in GNSS analysis, data standards, and the now-more-accurate P2 finding do not compensate for mandatory failures in maturity, monitoring and funding. |
| Validation | To be confirmed by EOP TPWG and UN-GGCE prior to final report publication. |
WP8 — Investment Prioritisation | Steps 13–14
Purpose (Section 14): begins only once WP7 has produced determinations — prioritisation is driven by robustness gained, not maturity improvement for its own sake. Gap types (Section 14.1): Capability / Architecture / Governance / Combined. Priority classification (Section 14.2): 1 Continuity-critical, 2 Resilience-critical, 3 Capability-critical, 4 Sustainability-critical, 5 Improvement — an evidence gap blocking Robust at a criticality-5 function is Priority 1 on the same basis as a demonstrated failure (Section 14.1). Instrument: assessment A7.
What changed from v2. I-1 is substantively re-derived, not relabelled: the original called for establishing a second independent combination centre (a Redundant strategy, appropriate to one undivided SPOF). WP5's corrected architecture determination calls for Unique but protected instead — duplication within the 5-day threshold is impractical for either track, so the investment is succession planning and tested internal failover at the two existing institutions, not a third centre. I-4's priority also moves up: per Section 14.1, an evidence gap or open capability question at a criticality-5 function is Priority 1, and F6a/F6b are both criticality 5 with an unresolved capability question (B.1) — the original scored this Priority 2.
A7 — Investment Portfolio (EOP)
| Ref | Investment | Gap Type | Principles | Failure Scenario | Consequence of Inaction | Priority | Complexity |
|---|---|---|---|---|---|---|---|
| I-1 | Succession planning and tested internal failover at USNO (F6a) and SYRTE (F6b) individually — documented procedures, cross-trained staff, independent backup power/comms per institution. Not a third combination centre — WP5 determined duplication impractical within the ratified threshold. | Combined (capability + architecture) | P4, P5 | DS-1a, DS-1b | Neither track has a demonstrated recovery path if its own institution is disrupted; both currently rest on individual continuity that has never been tested. | Priority 1 | High |
| I-2 | Develop and operationalise emergency cyber-restore capability — geographically separate backup, tested restore procedure, software documentation | Combined | P4, P6 | DS-6 | Cannot confirm backup operability at either F6a or F6b. Evidence gap blocks Robust determination. | Priority 1 | Medium |
| I-3 | Establish a sustainable, diversified multi-source funding mechanism with emergency reserve (≥12 months operating costs) | Governance | P2, P3 | DS-5 | Product discontinuation risk within 6 months of major funder withdrawal — the one mandatory disruption fail remaining after the F6 correction. | Priority 1 | High |
| I-4 | Resolve the open Combination Processing question (B.1) — TPWG decides between deepening Geodetic Data Products/Reference Frames's definitions or ratifying a split — then build People and Process capability against whichever is resolved, at both F6a and F6b | Combined (capability + capability-model) | P5 | DS-1a, DS-1b, DS-5 | Both combination tracks are critically understaffed relative to required maturity (Function Risk Score 10 each), and neither gap can be formally closed against a capability record that isn't yet agreed. An evidence gap at a criticality-5 function is Priority 1, not 2 (Section 14.1). | Priority 1 | Medium |
| I-5 | Demonstrate the F6a/F6b independence test specified on A3 — a live exercise confirming separate software builds, data access and staff, not merely an unexercised assumption | Architecture | P2, P4 | DS-1a, DS-1b | The improved P2 finding currently rests on an asserted, not demonstrated, independence claim — the single largest gap between the corrected finding and a fully evidenced one. | Priority 1 | Medium |
| I-6 | Operationalise third IVS data transmission pathway; conduct e-VLBI failover exercise | Capability | P4, P6 | DS-2 | VLBI data centre dual-outage causes VLBI analysis failure within 48 hours. | Priority 2 | Medium |
| I-7 | Ratify the Real-Time Network/Observatory Monitoring capability (B.2) and close the resulting gap — KPIs, incident management, risk register, corrective action, governance reporting | Combined | P6 | All | No ability to detect or demonstrate resilience, and no ratified capability to score this against. P6 mandatory requirement unmet; Function Risk Score 10, High band. | Priority 2 | Low |
| I-8 | Establish independent EOP validation function — separate institution from either combination centre | Architecture | P2, P4 | DS-1a, DS-1b | Validation currently shares institutional dependency with whichever track it validates — not independent. | Priority 2 | Low |
| I-9 | Investment in southern hemisphere VLBI station infrastructure and DORIS/SLR expansion | Architecture | P1 | DS-4 | Geographic vulnerability — regional outage degrades solution geometry significantly. | Priority 3 | High |
| I-10 | VLBI observation People and Technology improvement (VLBI Data Acquisition and Storage) — staff training, instrument upgrades at 4 key stations | Capability | P5 | DS-4 | Minor maturity gaps; product continues but at reduced accuracy under stress. | Priority 3 | Medium |
| I-11 | Ratify Workforce Succession and Continuity Planning (B.4) and apply it across USNO, SYRTE, and IVS/IGS analysis centres | Combined | P5 | DS-5 | Long-term sustainability risk to specialist workforce at both combination tracks. | Priority 4 | Low |
| I-12 | GNSS analysis centre jurisdictional diversity improvement — encourage additional centres in underrepresented regions | Architecture | P2 | DS-3 | Minor — current GNSS diversity adequate; improvement reduces concentration risk. | Priority 5 | Low |
Cross-product urgency index (Section 14.3), illustrative for I-1. A sequencing aid for Priority 1–2 items only, not a funding formula. Urgency index = normalised Function Risk Score (÷20) × number of distinct products/functions addressed. I-1 addresses two functions (F6a, F6b) at Function Risk Score 10 each, and the same combination infrastructure underpins parts of ITRF and ICRF (per the Procedure's own worked example, Section 14.4) — so if I-1 is treated as shared across EOP, ITRF and ICRF: normalised score 10/20 = 0.5 × 3 products = 1.5, higher than an equally-scored investment benefiting EOP alone (0.5 × 1 = 0.5). Presented to UN-GGCE and funders alongside, not instead of, the Priority 1–5 classification above.
WP9 — Target Architecture and Roadmap | Steps 15–18
Step 15: Repeat WP1–WP8 for all five products (shown here for EOP only). Step 16: Analyse cross-product dependencies. Step 17: Consolidate target-state architecture. Step 18: Develop implementation roadmap aligned with the Joint Development Plan.
What changed here. The original document consolidated the target state into a single 11-row "Component" table (Observation infrastructure, Data centres, Analysis centres — VLBI, Analysis centres — GNSS, Combination centre, Software/processing, Data replication/access, Governance, Workforce/succession, Funding/sustainability, Monitoring/assurance, Recovery/failover). Checked against the two primitives that already exist — Organisations & Roles, and the real capability model — four of those eleven rows turned out to just be the Organisations primitive under a different label, and six mapped onto existing or requested capabilities (capability_model_change_submission.md, Section D). Below is the same content, in two A9 (target-state architecture component) tables instead of a third invented one — updated for the corrected F6a/F6b structure.
A9 — Target-State Architecture — Organisation / Facility-Type Rollup
| Facility Type | Current State | Required Robust State | Gap |
|---|---|---|---|
| Observing Stations / Networks | Multi-technique global network; southern hemisphere and Africa gaps | Geographically balanced network across ≥4 regions with minimum geometry requirements per technique | Southern hemisphere VLBI investment; DORIS/SLR expansion |
| Data Centres | 3 nodes (Germany, USA, Japan); same-provider internet backbone for e-VLBI | ≥3 independent nodes in ≥3 jurisdictions; independent transmission pathways; tested restore | Third transmission pathway; failover exercise; Tsukuba restore test |
| Analysis Centres — VLBI | ~7 centres; 5 jurisdictions; geographically clustered | ≥3 fully operational, independent centres with independent software and data | Reduce EU/US concentration; strengthen non-Western centres |
| Analysis Centres — GNSS | Multiple IGS centres; good diversity | Adequate — maintain and extend jurisdictional spread | Minor diversity improvement desirable |
| Combination Centres — Rapid (F6a) | USNO (USA) — individually a single point of failure for the rapid-product track | Protected, not duplicated: documented succession, tested internal failover, independent backup infrastructure at USNO itself | Succession planning; internal failover exercise (I-1) |
| Combination Centres — Final (F6b) | SYRTE (France) — individually a single point of failure for the final-product track | Protected, not duplicated: same requirements as F6a, at SYRTE | Succession planning; internal failover exercise (I-1) |
| Cross-track independence (F6a ↔ F6b) | Asserted separate software/data/staff; never live-exercised | Demonstrated independence per the A3 test: a real exercise confirming no shared operational dependency | Independence exercise (I-5) — the gap between the improved P2 finding and a fully evidenced one |
A9 — Target-State Architecture — Capability-Domain Rollup
| Capability (real, or Requested) | Current State | Required Robust State | Gap |
|---|---|---|---|
| Geodetic Software and Tools | Partially documented; backup not independently tested | Fully documented; geographically independent backup; tested restore; open-source where feasible | Documentation programme; independent backup; restore exercise |
| Data Preservation / Data Sharing | Partial replication; not all types fully mirrored | Complete replication across ≥3 independent nodes; all EOP-relevant data accessible independently | Replication programme; access testing |
Governance and Strategy domain (Mandate, Legal Framework, Funding and Investment, Budgeting) — scored per organisation, not per function; see capability_model_change_submission.md Section C | Governance basis (C6): the daily EOP combination arrangement across both USNO and SYRTE rests on informal or voluntary practice — no binding instrument requires either institution to continue. Emergency funding mechanism: no defined basis. | Required governance basis: binding obligation covering continuity, escalation and emergency governance for both tracks; diversified, multi-year-committed funding with a 12-month reserve | Governance requirement (per C6, carried to WP9 synthesis): a binding continuity and access instrument covering both combination tracks — currently absent at any strength above informal practice |
| Workforce Succession and Continuity Planning (requested, B.4) | Specialist staff; both USNO and SYRTE understaffed relative to requirement; succession risk at each | Required PPTD achieved at both combination tracks; succession plans documented at each institution | Staff investment at both tracks; succession planning programme (I-11) |
| Real-Time Network/Observatory Monitoring (requested, B.2) | Partial — annual reports only | KPIs, incident management, risk register, governance reporting, corrective action | Full monitoring framework; incident management; corrective action policy (I-7) |
| Disaster Recovery and Supply Chain Continuity | Untested; backups not geographically independent at either track | Demonstrated failover for all critical functions; recovery tested ≥annually | Failover programme; annual exercise regime |
| Combination Processing — open question (B.1) | Two individually protected tracks (USNO, SYRTE), each below required maturity; not yet settled whether this scores against a deepened Geodetic Data Products/Reference Frames or a new split capability | Both tracks at required maturity, against a resolved capability record, with demonstrated cross-track independence | Succession and failover investment at each track (I-1); resolve B.1 (I-4) before maturity investment can be formally scored; demonstrate independence (I-5) |
Cross-Product Dependencies — EOP Contribution
EOP is a dependency for the following other critical products. These dependencies are captured in the cross-product analysis (Step 16) and would be addressed in the consolidated target architecture (Step 17).
| Dependent Product | Dependency on EOP | Shared Supply-Chain Risk |
|---|---|---|
| ITRF | EOP (especially UT1 and polar motion) are essential inputs to ITRF realisation and maintenance. Degraded EOP accuracy directly propagates into ITRF precision. | Common IERS institutional dependency; common VLBI infrastructure |
| ICRF | Nutation and precession parameters link ICRF to ITRF. EOP inconsistencies degrade ICRF–ITRF relationship. | Common VLBI observation network; common analysis software environments |
| Satellite Orbits | Satellite orbit determination requires EOP (especially polar motion and UT1) to convert between reference frames. Real-time satellite navigation depends on rapid EOP. | Common GNSS analysis infrastructure; common IGS data centres |
| Global Gravity Field | Indirect dependency — accurate reference frame maintenance requires EOP consistency for long time-series gravity analysis. | Common IERS data centres; shared workforce in specialist geodetic community |
A10 — Implementation Roadmap — EOP (Illustrative Sequencing)
Success indicators are written as demonstrations, not establishments (Section 15.4) — "USNO and SYRTE each have a documented succession plan" is not a success indicator; "a live internal failover at USNO met the ratified 5-day threshold" is.
| Action | Investment Ref | Priority | Owner | Indicative Timing | Dependencies | Success Indicator |
|---|---|---|---|---|---|---|
| Succession planning and tested internal failover at USNO and SYRTE individually | I-1 | Priority 1 | USNO + SYRTE + UN-GGCE | Months 1–12 | Funding mechanism (I-3) should be agreed in parallel | A live internal failover exercise at each institution meets the ratified 5-day threshold |
| Emergency cyber-restore capability — geographically separate backup, tested restore, software documentation | I-2 | Priority 1 | IERS + UN-GGCE | Months 1–12 | None — can proceed immediately | Documented restore procedure; tested restore within 48 hours from an independent site |
| Sustainable multi-source funding mechanism with 12-month reserve | I-3 | Priority 1 | UN-GGCE + Member States | Months 1–9 | Political commitment from ≥3 major funders | Multi-year funding agreements signed; reserve account established |
| Resolve open Combination Processing question (B.1); staff and process investment at both F6a (USNO) and F6b (SYRTE) against whichever resolution | I-4 | Priority 1 | USNO + SYRTE; TPWG (resolution + any ratification) | Months 1–18 | Resolution decision precedes/parallels funding (I-3) | B.1 resolved (deepened definition or ratified split); PPTD People reaches required level at both tracks; succession plans approved |
| Live cross-track independence exercise between F6a and F6b | I-5 | Priority 1 | USNO + SYRTE + UN-GGCE | Months 6–15 | I-1 succession work substantially complete | Documented exercise confirms no shared software, data-access or staffing dependency between the two tracks |
| Third data transmission pathway and e-VLBI failover exercise | I-6 | Priority 2 | IVS Data Centres + UN-GGCE | Months 3–12 | None | Third pathway operational; annual failover exercise completed |
| Ratify Real-Time Network/Observatory Monitoring (B.2); establish monitoring and assurance framework | I-7 | Priority 2 | UN-GGCE + IERS; TPWG (ratification) | Months 1–12 | None | Capability ratified; KPI dashboard live; first annual assurance report published |
| Independent validation function established | I-8 | Priority 2 | UN-GGCE + new host institution | Months 6–18 | Funding (I-3); governance decision | Validation produced by an institution independent of both F6a and F6b, on a parallel schedule |
| Southern hemisphere station investment — new/upgraded VLBI and DORIS stations | I-9 | Priority 3 | Member States + UN-GGCE | Months 18–60 | Bilateral agreements; land access; funding | ≥2 new stations operational in identified geographic gaps |
| Ratify Workforce Succession and Continuity Planning (B.4); succession programme at USNO, SYRTE and IVS/IGS centres | I-11 | Priority 4 | USNO + SYRTE + IVS/IGS service leads; TPWG (ratification) | Months 6–48 | Institutional commitment | Capability ratified; succession plans documented at both combination tracks and all critical function providers |
Instruments used (Section 15.5). Assessment: A8 (governance requirement record), A9 (target-state architecture component), A10 (roadmap action).
Illustrative — EOP: the I-1 succession-and-failover investment at USNO and SYRTE is sequenced as two Priority 1 roadmap actions, owned respectively by each institution with UN-GGCE support, dependent on the funding-sustainability action (I-3) being secured first. Their governance requirements join those generated by ITRF and ICRF for the same institutions into a single consolidated requirement in WP9's synthesis (Section 15.3): a binding continuity and access obligation covering combination functions serving multiple products, not two separate single-product instruments.
WP10 — Validation, Finalisation and Monitoring | Steps 19+
Purpose (Section 16): the last quality gate before the assessment feeds governance decisions. Adds no new analysis — structurally challenges everything already produced, including a traceability audit sampling findings back to their capture field and source (Section 16.1).
| Monitoring Activity | Frequency | Owner | Output |
|---|---|---|---|
| Product requirements reassessment | Every 3 years or on major change in user requirements | EOP TPWG | Updated Requirements Specification (A1) |
| Capability maturity validation | Annual | UN-GGCE / capability owners | Updated maturity capture (C3) and gap assessment (A2) |
| Critical dependency monitoring | Quarterly | UN-GGCE | Dependency risk register update (C2) |
| Geographic / political independence check | Annual | UN-GGCE | Principle test sheet update (A5) |
| Failover and recovery exercise | Annual (minimum) | USNO + SYRTE, individually, per the Unique-but-protected strategy | Exercise report; pass/fail against the ratified 5-day threshold, at each institution |
| Workforce and funding sustainability review | Annual | UN-GGCE + governance | Sustainability risk register update |
| Incident and near-miss reporting | Continuous / reviewed quarterly | IERS Central Bureau + new assurance function | Incident log; corrective action register |
| Governance-level resilience reporting | Semi-annual | UN-GGCE → governance mechanism | Key Resilience Indicators dashboard |
| Evidence register maintenance | Continuous | Consultant / UN-GGCE | Version-controlled evidence register |
| Robustness re-determination | On completion of Priority 1 and 2 investments; otherwise every 3 years | EOP TPWG + UN-GGCE | Updated Robustness Decision Record |
| Capability model change requests | Continuous, batched for ratification at WP1 kickoff and the annual maturity validation cycle | UN-GGCE + affected TPWG(s) | Updated capability model version; see capability_model_change_submission.md |
Closing Summary — EOP Worked Example
| Question | EOP Answer (Simulated except where marked real) |
|---|---|
| What must EOP reliably deliver? | Accurate polar motion (≤0.05 mas), UT1–UTC (≤0.02 ms) and nutation/precession products on a continuous basis, rapid products within 24 hours. Recovery threshold ratified at 5 days via the real bottom-up method (Section 6.3), worked through in WP2. Long-term series continuity essential. |
| What does the supply chain need to look like? | Multi-technique global observation network; independent data archiving across ≥3 jurisdictions; two individually protected combination tracks in separate jurisdictions (USNO/USA, SYRTE/France — real), with demonstrated cross-track independence, not a third centre; independent validation; replicated dissemination; multilateral governance with emergency protocols. |
| What capabilities and maturity are required? | Twelve real capability-at-function pairs at required maturity, plus one capability pending ratification (Real-Time Network/Observatory Monitoring, B.2) and one still-open question applying to both combination tracks (Combination Processing, B.1). Critical gaps, all Function Risk Score 10 / High band (Annex A.9): F6a (binding gap 2, People), F6b (binding gap 2), Real-Time Monitoring (binding gap 2). All others Minor band, addressable via Priority 2–3 investments. |
| What happens when critical components are disrupted? | DS-5 (funding loss) is the one remaining mandatory fail. DS-1a/DS-1b (USNO or SYRTE withdrawal) are PASSES WITH CONDITION, not FAILS — corrected once the real jurisdictional split is mapped; the original undivided F6 could not represent this outcome. DS-2 and DS-6 remain evidence gaps. DS-3 and DS-4 are absorbed by existing diversity. |
| What does the P2 correction actually change? | A real, evidence-driven improvement — concentration risk in one jurisdiction becomes coordination risk across two (Annex A.7) — but not the product-level determination. Per Section 3, principles are never averaged: P5 and P6 remain independently NOT MET, and DS-5 remains a mandatory fail regardless of P2's improvement. Showing an improved principle finding that doesn't flip the outcome is deliberate — it demonstrates the decision rules working as designed, not smoothed into a single number. |
| What happens when a function doesn't map to any existing capability? | It doesn't get silently scored as if the capability existed (what the original worked example's C-27/C-47 did) — and it doesn't get treated as a clean gap just because the label doesn't match either. A semantic check against full capability definitions runs first (capability_model_change_submission.md, Section A). Two real outcomes exist, both drawn from this exact EOP case: monitoring/assurance produced a clean New Capability Request (B.2). Combination did not resolve cleanly — carried forward as an open question (B.1), applying identically to both F6a and F6b. Showing both outcomes is deliberate: real TPWGs will hit both kinds. |
| What investments and actions are required? | Five Priority 1 investments are now mandatory for any Robust determination: (I-1) succession and internal failover at USNO and SYRTE individually — not a third centre; (I-2) backup/restore capability; (I-3) sustainable funding; (I-4) resolve the open Combination Processing question at both tracks; (I-5) a live independence exercise between F6a and F6b. Three Priority 2 investments address remaining mandatory gaps. Total portfolio: 12 prioritised actions over an indicative 1–60 month horizon. |
This worked example is simulated for illustrative purposes except where marked real. All PPTD scores, expert-elicitation numbers, and modelled disruption results remain hypothetical and do not represent actual assessments of the global geodesy supply chain. What's real: the capability names and the semantic-matching process that produces B.1/B.2 (outputs/capability_model_change_submission.md); the F6a/F6b jurisdictional split, the SYRTE/USNO institutional attribution, and the resulting DS-1a/DS-1b outcome (docs/EOP_Worked_Example_Comparison_BW.md, checked against the real WA2 Annex); and the instrument names, work-package structure, and Annex A calculation method throughout, all drawn directly from ROBUSTNESS_TESTING_PROCEDURE_v1.6.docx.